We design architecture for all: inclusive, barrier free and participatory


20120425-133057.jpg
Our enormous crane left the site this morning: amazing driving with just millimetres to spare in our very tight and bendy lane. They only needed three days to get the whole steel frame erected. Over that time we kept meeting people who could see the crane from their kitchen, sitting room, garden; luckily our house won’t be as prominent on the Portobello skyline (although hopefully just high enough to sneak a sea view).
Steel frame photos to follow tomorrow: we have now been in every room on our ground floor.

20120425-133057.jpg
Our enormous crane left the site this morning: amazing driving with just millimetres to spare in our very tight and bendy lane. They only needed three days to get the whole steel frame erected. Over that time we kept meeting people who could see the crane from their kitchen, sitting room, garden; luckily our house won’t be as prominent on the Portobello skyline (although hopefully just high enough to sneak a sea view).
Steel frame photos to follow tomorrow: we have now been in every room on our ground floor.